Installed 96 new data drops to office remodel. All old cat5 wiring was removed and replaced with new cat6. A new rack was installed with wire management. We also designed CAD rack and floor plans. Setup and installed HD video conference unit in conference room.
![](https://completeintegratedtech.com/wp-content/uploads/2016/04/Chilton-Trust-Mgmt-logo.jpg)